Hurricane Ike caused severe damage to asphalt roads on the Bolivar Peninsula. CDGCE was engaged by Galveston County to develop…
Harris County contracted with Gooden Engineers to develop Plans, Specifications, and Estimates (PS&E) for the 1.2-mile extension of El Dorado…
CDGCE developed the PS&E and performed construction phase services for the water line replacements in Spring Oaks. The project consisted…
CDGCE developed the PS&E and performed construction phase services for approximately 29,000 linear feet of 4-inch, 8-inch, and 12-inch water…
CDGCE is the Prime Professional for 15,000 linear feet of 20″ diameter water line. The water line is meant to…